Draft EIR Engineering Committee Meeting Presentation |
01/19/2016 |
12.5 MB, PDF |
Notice of Availability and Public Review |
12/04/2015 |
1.5 MB, PDF |
Draft EIR |
12/04/2015 |
25 MB, PDF |
Public Scoping Meeting Presentation |
09/04/2014 |
7 MB, PPT |
Notice of Preparation of Draft Environmental Impact Report |
08/15/2014 |
2 MB, PDF |
Feb 2014 Public Informational Meeting PosterBoards |
02/25/2014 |
5.1 MB, PDF |
Pre-Design Geotechnical Report - Big Hill and Whisky Run Reservoir Sites |
05/01/2009 |
13.6 MB, PDF |
Lincoln Area Water Treatment Plant Planning & Site Study |
08/01/2005 |
40 MB, PDF |
Public Meeting Announcement - (Feb. 26, 2008 and Mar. 4, 2008) |
03/04/2008 |
29 KB, PDF |
Cross River Penstock |
01/01/2011 |
2.4 MB, PDF |
Existing Facility Eval |
03/01/2012 |
3.3 MB, PDF |
Hydroelectric Power Generation Feasibility |
11/01/2010 |
2.1 MB, PDF |
Land Use and Water Demands - Revised |
10/01/2009 |
5.1 MB, PDF |
Pipeline and Related Facilities Predesign |
02/01/2011 |
17 MB, PDF |
Basis of Design |
07/01/2010 |
16.8 MB, PDF |
Backup Water Supply Alternatives Evaluation |
11/01/2010 |
3 MB, PDF |
Raw and Treated Water Pipelines Corridor Evaluation |
01/01/2010 |
28.4 MB, PDF |
Raw Water Storage Facility Siting Study |
01/01/2010 |
11.2 MB, PDF |
Treated Water Hydraulic Control and Metering Station |
10/01/2009 |
2.9 MB, PDF |
Water Treatment Plant Alternative Analysis - Summary Report - Draft |
04/01/2010 |
2.1 MB, PDF |
Water Treatment Plant Alternative Analysis - Tech Memo - Draft |
02/01/2010 |
2.1 MB, PDF |
Water Quality Evaluation |
10/01/2009 |
30.5 MB, PDF |
Water Treatment Plant Siting |
10/01/2009 |
14.6 MB, PDF |
Environmental Constraints Analysis - 1 of 2 |
10/01/2009 |
8.1 MB, PDF |
Pages from Environmental Constraints Analysis - 2 of 2 |
10/01/2009 |
2.9 MB, PDF |
Pipeline and Related Facilities Predesign Drawings - 1 of 2 |
02/01/2011 |
6 MB, PDF |
Pipeline and Related Facilities Predesign Drawings - 2 of 2 |
02/01/2011 |
7.3 MB, PDF |
Water Treatment Process Screening - 1 of 2 |
05/01/2009 |
16.9 MB, PDF |
Water Treatment Process Screening - 2 of 2 |
05/01/2009 |
14.8 MB, PDF |
Big Hill Reservoir and Related Facilities Predesign |
12/01/2010 |
9.9 MB, PDF |
Water Treatment Plant Alternative Analysis Full Draft |
02/01/2010 |
7.9 MB, PDF |
Water Treatment Plant Alternative Analysis Summary Draft |
04/01/2010 |
2.1 MB, PDF |
Pre-Design Geotechnical Report - Big Hill and Whisky Run Reservoir Sites |
05/01/2009 |
13.6 MB, PDF |
Pre-Design Geotechnical Report - Pipeline and Whisky Run Tunnel |
05/01/2009 |
23.5 MB, PDF |
Pre-Design Geotechnical Report - Walker Water Treatment Plant |
05/01/2009 |
12.6 MB, PDF |
Project Needs and Objectives DRAFT |
11/01/2010 |
153 KB, PDF |
Water Supply Impacts |
08/01/2011 |
1.5 MB, PDF |
Draft Bear River Pump Station, Alternative Analysis |
12/01/2012 |
5.3 MB, PDF |
Draft Combie Reservoir Need for a Biological Risk Assessment Technical Analysis |
12/01/2012 |
887 KB, PDF |
February 2014 Public Informational Meeting Boards |
02/18/2014 |
5.1 MB, PDF |